Skip to content
Blog
Foreign tradeOctober 30, 2026· 7 min

AQL inspection before you pay for an import

How to use ISO 2859-1 AQL sampling to decide whether an imported lot is accepted: levels, code letter, sample size, critical, major and minor defects, and when to hold the balance.

The container arrives, clears customs and, when the boxes are opened, one in ten fans won’t switch on. The balance to the supplier was already paid against the copy of the bill of lading, and the claim turns into months of emails. The way to avoid it is to check the lot before paying, with a method the supplier agrees to in advance: AQL sampling inspection.

What AQL is

AQL (Acceptable Quality Limit) is the percentage of defective units that, on average, you are willing to tolerate in a process. Not every unit is checked: a random sample of a defined size is taken and, depending on how many defects appear, the lot is accepted or rejected as a whole.

The most widely used reference is the ISO 2859-1 standard (equivalent to the old MIL-STD-105 and to ANSI/ASQ Z1.4). This guide covers single sampling with normal inspection, the most common case in international purchasing.

Two important clarifications:

  • AQL is not a guarantee that the lot has fewer defects than that percentage. It is a decision rule with a known statistical risk.
  • The tables in this article are an excerpt for the example. Before agreeing a plan with your supplier, check the current version of the standard.

The four inputs of the plan

To build a sampling plan you need:

  1. Lot size: the units of the order being inspected (for example, those in the shipment).
  2. Inspection level: the standard defines general levels I, II and III, and special levels S-1 to S-4 for destructive or expensive tests. Level II is the usual one; level I reduces the sample and level III increases it.
  3. AQL per defect type: a different one is set for critical, major and minor defects.
  4. Sampling type: single, double or multiple. Here we use single.

From lot size to sample

The procedure has two steps. First, with the lot size and the level, the standard gives a code letter. Then, with the letter, it gives the sample size and, for each AQL, the acceptance (Ac) and rejection (Re) numbers.

Excerpt for level II, normal inspection, single sampling:

Lot size Letter Sample AQL 2.5 (Ac/Re) AQL 4.0 (Ac/Re)
281 to 500 H 50 3 / 4 5 / 6
501 to 1,200 J 80 5 / 6 7 / 8
1,201 to 3,200 K 125 7 / 8 10 / 11
3,201 to 10,000 L 200 10 / 11 14 / 15
10,001 to 35,000 M 315 14 / 15 21 / 22

For the same lot of 3,201 to 10,000 units, level I gives letter J (80 units) and level III gives letter M (315 units). A bigger sample means less risk of accepting a bad lot, but a higher inspection cost.

Critical, major and minor

Classifying defects properly matters as much as the number:

  • Critical: can harm a person or breach a mandatory standard. A plug without a ground connection, a sharp edge on a toy.
  • Major: the product does not do its job or the customer would return it. A fan that won’t switch on, a dimension out of tolerance.
  • Minor: does not affect use, but does affect presentation. A light scratch, a crooked label.

Widely used starting values are 0 for critical, 2.5 for major and 4.0 for minor. The standard has no AQL “0”; in practice zero tolerance is applied: with the level’s sample, the lot is accepted with 0 critical defects and rejected with 1.

Write down the defect list for each product, with example photos, and attach it to the purchase order. If the inspector and the supplier don’t classify the same way, the plan is useless.

Example: 5,000 fans

Suppose an order of 5,000 fans, level II, AQL 0 / 2.5 / 4.0. The lot falls between 3,201 and 10,000: letter L, sample of 200 units.

Class AQL Accept with Reject with
Critical 0 0 1
Major 2.5 up to 10 11 or more
Minor 4.0 up to 14 15 or more

The inspector checks the 200 units. Three possible outcomes:

  • 0 critical, 7 major, 11 minor: every class below its rejection number. Lot accepted.
  • 0 critical, 7 major, 15 minor: the minor defects reach the rejection number. Lot rejected, even though no fan is faulty.
  • 1 critical, regardless of the rest: lot rejected.

It takes one class reaching its rejection number to reject the lot. Rejecting does not necessarily mean sending it back: the usual step is to require the supplier to sort 100 % and replace, and then inspect again.

Pre-shipment inspection (PSI)

Inspection can take place at different moments: before production, during production, before shipment and at container loading. The most useful one to protect the payment is the pre-shipment inspection (PSI), which in practice is done when production is finished and mostly packed, so that the sample is representative.

Good practices:

  1. An independent inspector or your own, but never the supplier’s.
  2. A random sample of closed boxes, chosen by the inspector.
  3. A report with photos, defects per class and the plan used (lot, level, AQL, letter, sample).
  4. At loading, record the container and seal numbers.

When to hold the payment

AQL has teeth when it is tied to payment. A common structure is a deposit to start production and the balance against an approved PSI. Suppose, as an example, a 30 % deposit and a 70 % balance:

  • PSI passed: the balance is released.
  • PSI failed: the balance is held until a passed re-inspection at the supplier’s cost.
  • Conditional approval (for example, accepted with a discount): it is put in writing, with its reason, before paying.

If you pay by letter of credit, the inspection certificate can be included among the required documents; check the wording with your bank. What matters is that the condition is in the purchase order or the contract, signed before production.

Common mistakes

  • Agreeing on “export quality” without a written sampling plan.
  • Letting the supplier choose the sample boxes.
  • Mixing major and minor defects in a single count.
  • Paying the balance against the shipping copy without waiting for the report.
  • Using tables copied from the internet without checking against the current standard.

Checklist

  • Defect list per product, classified as critical, major and minor, with photos.
  • Plan written into the purchase order: level, AQL per class and timing of the inspection.
  • Independent inspector, who chooses the sample.
  • Report with plan, defects per class and photos, filed with the import.
  • Balance conditional on a passed PSI.
  • Re-inspection and discounts documented with their reason.

Bringing it into a system

An ERP like MKA keeps the inspections (pre-production, during production, pre-shipment and loading) in each import file, works out the plan under ISO 2859-1 from the lot, the level and the AQL of each class, suggests rejection when a class reaches its rejection number and can warn about or block payment of the supplier’s invoices if the file has no passed PSI; you can see it in the imports module.

See MKA with data from your industry.

In 30 minutes we walk through your real flow: from sale to invoice, from stock to journal entry.