Skip to content
MKA for fleet and heavy equipment

Let the machine stop when you decide, not when it breaks.

For mining, transport, agribusiness and any company whose cost lies in keeping equipment running: preventive plans by hour meter, calendar or both, work orders whose parts are deducted from the warehouse, failure analysis with the ISO 14224 taxonomy, fixed-asset depreciation, camp petty cash settled from the phone and payroll fed by the biometric clock.

What your business lives with today

  • Preventive maintenance depends on someone writing down the machine hours and remembering to check them.
  • The part leaves the warehouse “for the machine” and nobody knows which unit it was charged to.
  • The same failure comes back every few weeks and gets fixed as if it were the first time.
  • Camp expenses arrive in an envelope weeks later and don’t match the fund.

What you’ll measure

Preventive compliance
91 %+14 pts
Fleet MTBF
412 h+96 h
mean time between failures
Mean time to repair (MTTR)
5,8 h−2,1 h
Maintenance cost
Bs 184 k−11 %
monthly, parts + labor

Sample indicators with illustrative data. In MKA they are computed live from your operation.

A day in your business

One machine, from the hour-meter reading to the month’s cost

Step 1/8

Machine in the tree

Each machine hangs from its area with its criticality, and its components hang from it, with their own and accumulated cost.

Maintenance

Try it right here

From the hour meter to the closed preventive order.

Enter readings (a lower one is rejected), watch the plan come due by meter and generate the order; on the technician’s phone it runs with a checklist, warehouse parts, before-and-after photos and a signature.

Try it right here

Run the month’s depreciation and reverse it if something doesn’t add up.

Archive a disposed asset, preview each asset’s straight-line charge, post the run and reverse it to leave everything as it was.

Try it right here

From the spender’s phone to accounting’s inbox.

The spender photographs the receipt and is warned if that invoice was already submitted; accounting processes, returns or discards it and replenishes the fund only for what was approved.

Try it right here

Receive in parts and pay several invoices in one go.

The warehouse scans the order and the lot and receives only what arrived; accounting records the invoice for what was received and applies a single payment to the supplier’s open invoices.

Your dashboard

The dashboard of a business like yours

Real MKA widgets, which each user arranges as they like.

Maintenance SLA
kpi

86.5 %

Compliance

2

Overdue

5

Due soon

OT-1184Toyota 2.5 t forklift−2 d
OT-1191Cold room−1 d

Handle overdue and soon-due work orders first.

Key KPIs
kpi
Sales this year▲ 12.6 %
Bs 11.92 M
Total invoiced this year
Close rate
64.3 %
Closed vs cancelled
Average per customer
Bs 18 k
Average customer value
Open orders
47
In progress, not closed
Cash available
Bs 1.28 M
Balance in active accounts

See at a glance whether the year is on track: sales, close rate, open orders and cash.

Actual vs budget
bar
91.9 %executed · Bs 3.31 M / Bs 3.60 M
Main deviations
International freightBs 497 k▲ 18.4 %
PayrollBs 1.48 M▲ 3.1 %
MaintenanceBs 166 k▼ 8.0 %
AdvertisingBs 203 k▼ 22.0 %

Correct over-budget lines before month-end.

Inventory valuation
bar
Bs 6.29 Mweighted average cost
CeramicsBs 2.18 M
Building materialsBs 1.46 M
SanitaryBs 968 k
PaintsBs 713 k
ElectricalBs 538 k
FaucetsBs 422 k

Know how much capital is tied up and in which category.

Accounts payable
bar
Bs 612 k38 pending supplier invoices
Not due1-3031-60>60

Prioritize supplier payments by age.

Cash flow
kpi
Cash in accounts
Bs 1.28 M
▲ 8.4 % vs last year
Receivables
Bs 806 k
214 open invoices
Payables
Bs 612 k
38 supplier invoices
Net position
Bs 1.48 M
cash + AR − AP

Know the net position: cash plus receivables minus payables.

Target gauge
gauge
87.4 %
of target Bs 1.45 M
< 80 %80–95 %≥ 95 %

Know whether the monthly or quarterly target will be met, traffic-light style.

Replicas of real MKA dashboard widgets, with illustrative data.

Included reports

The questions management asks every week, answered.

Projects, maintenance & field
Reliability

How often does equipment fail, and how long does repair take?

CSVPDFXLSX
Projects, maintenance & field
Failure analysis

What are the most frequent failure modes?

CSVPDFXLSX
Projects, maintenance & field
Maintenance costs

How much do I spend on maintenance, labor plus parts?

CSVPDFXLSX
Projects, maintenance & field
Top assets

Which equipment causes the most trouble and costs the most?

CSVPDFXLSX
Projects, maintenance & field
Corrective vs. preventive

Am I firefighting or preventing failures?

CSVPDFXLSX
Projects, maintenance & field
PM compliance

Is preventive maintenance being done on time?

CSVPDFXLSX
Projects, maintenance & field
Spare parts

Which spare parts do I use most, and on which equipment?

CSVPDFXLSX
Accounting & finance
Fixed assets by group

What value do I hold in vehicles, machinery, equipment and other groups?

CSV
Accounting & finance
Petty cash by cost center

In which cost centers is petty cash spent?

Pantalla

All-in-One

The modules you’ll use

FAQ

Can I schedule preventive work by usage hours and by date at the same time?

Yes. Each plan can be by calendar, by meter or both, and the next due date is anchored to when it was due, not to when it was done.

Are preventive orders generated automatically?

The system calculates when each plan is due and has an automatic scheduler, which is off by default so you decide when to turn it on.

Does it read hours from GPS or track fuel?

Not today. There is no GPS or equipment telemetry integration, and no fuel tracking. Hour-meter readings are entered manually, back-dated or imported in bulk.

See MKA running for fleet and heavy equipment like yours.

In 30 minutes we walk through your real flow: from sale to invoice, from stock to journal entry.