Preventive by usage or date
Plans by CALENDAR, METER or BOTH; the next due date anchors on the due date, not on when the work was done.
Preventive plans triggered by calendar, by meter reading or by both. Work orders with spare parts from the warehouse, photo and signature evidence, and a labor cost that freezes on close. With an ISO 14224 failure taxonomy to know what breaks and why.
Without MKA
What you’ll measure
Sample indicators with illustrative data. In MKA they are computed live from your operation.
Try it right here
The maintenance supervisor enters readings (a lower one is rejected), the plan comes due by meter and the WO is generated with one button. On the technician’s phone the WO is carried out: checklist, warehouse parts, before-and-after photos, signature and acceptance. "Watch it run" plays it for you.
Example flow
The machine hangs from its line, area and plant, with its criticality.
Benefits
Plans by CALENDAR, METER or BOTH; the next due date anchors on the due date, not on when the work was done.
Plant, area, line, machine and component, up to 20 levels, with own and rolled-up costs.
Mode, cause and action per ISO 14224, with Pareto charts and recurring-failure detection.
Technician, specialty or global rate in cascade, frozen when the order closes.
Response and resolution deadlines fixed at creation, with an overdue and due-soon board.
Before-and-after photos, signature and customer acceptance on every order.
In detail
All-in-One
Data flows between modules on its own: no integrations, no exporting or importing.
The system calculates when each plan is due, and there is an automatic scheduler that ships turned off so you decide when to enable it.
You declare the meter replacement and the new reading can start lower; outside that case, a lower reading is rejected.
More in Projects & operations
In 30 minutes we walk through your real flow: from sale to invoice, from stock to journal entry.